Contargo Ginsheim Gustavsburg

Terminal

Address

Am Mainufer 18
65462
Ginsheim-Gustavsburg
Germany

Services

  • Pre-transport and end-transport
    Yes
  • Warehouse
    Yes, by partner external
  • Transhipment dangerous goods
    Class 2.1, Class 2.2, Class 2.3, Class 3.1, Class 3.2, Class 3.3, Class 4.1, Class 4.2, Class 4.3, Class 5.1, Class 6.1, Class 6.2, Class 8, Class 9
  • Storage dangerous goods
    Class 2.1, Class 2.2, Class 2.3, Class 3.1, Class 3.2, Class 3.3, Class 4.1, Class 4.2, Class 4.3, Class 5.1, Class 6.1, Class 6.2, Class 8, Class 9
  • Reefer connections
    20
  • Gas measurement and forced degassing
    Yes, by partner external
  • Empty Depot Services
    Cleaning, Repair, Pre-trip Inspection, Estimating
  • Tank cleaning
    Yes, by partner external

Opening hours

Business
Monday7:30-17:30
Tuesday7:30-17:30
Wednesday7:30-17:30
Thursday7:30-17:30
Friday7:30-17:30
SaturdayClosed
SundayClosed
Barge
Monday6:00-22:00
Tuesday6:00-22:00
Wednesday6:00-22:00
Thursday6:00-22:00
Friday6:00-22:00
Saturday6:00-22:00
SundayClosed

Empty container depots

OperatorPickUpDropOff
K-Tainer
CSAV

Intermodal connections

OperatorTransit timeFrequency
3 days~ 1 x /week
Hutchison Ports ECT Euromax - Rotterdam to Contargo Ginsheim Gustavsburg
3 days~ 2 x /week
Contargo Ginsheim Gustavsburg to Maasvlakte Terminals - Rotterdam
3 days~ 1 x /week
Contargo Ginsheim Gustavsburg to Hutchison Ports ECT Delta - Rotterdam
3 days~ 2 x /week
Contargo Ginsheim Gustavsburg to City Terminals - Rotterdam
3 days~ 2 x /week
Maasvlakte Terminals - Rotterdam to Contargo Ginsheim Gustavsburg
3 days~ 1 x /week
Contargo Ginsheim Gustavsburg to APM Terminals Rotterdam B.V. - Rotterdam
3 days~ 1 x /week
Hutchison Ports ECT Delta - Rotterdam to Contargo Ginsheim Gustavsburg
3 days~ 1 x /week
APM Terminals Rotterdam B.V. - Rotterdam to Contargo Ginsheim Gustavsburg
3 days~ 2 x /week
City Terminals - Rotterdam to Contargo Ginsheim Gustavsburg
3 days~ 1 x /week
Contargo Ginsheim Gustavsburg to Hutchison Ports ECT Euromax - Rotterdam
3 days~ 1 x /week
Rotterdam World Gateway (RWG) - Rotterdam to Contargo Ginsheim Gustavsburg
3 days~ 1 x /week
Contargo Ginsheim Gustavsburg to Rotterdam World Gateway (RWG) - Rotterdam

Sustainability

CO2 emission/container: 0.00 kg Terminal avg.: 11.86 kg
CO2 reduction (level 0-4):
  • Monitoring fuel usage
  • Efficient equipment usage
  • Efficient operations
  • Communication
  • Innovation
  • Supply chain collaboration
CO2 reduction level (avg)
0
1
2
3
4

This terminal was last audited on: Tuesday, October 24, 2017

Audit details

(last audit on Tuesday, October 24, 2017) Info on terminal details

Profile

  • Lot size terminal
    16000 m2
  • Capacity - containers per annum
    40000
  • Quay length
    150 m
  • Number of rail tracks on terminal
    0
  • Number of cranes
    1
  • Number of reach stackers
    1
  • Number of empty stackers
    1
  • The container terminal at kilometre 1 of the River Main links the Rhine-Main metropolitan region to Rotterdam and Antwerp, as well as to the other Contargo terminals. The new terminal covers an area of 16,000 m2. The quayside is 160 metres in length. Reefer connections are on hand for your convenience. Among the services on offer at the new location are transport by inland waterway or road, as well as the handling of standard and hazardous materials containers, reefers and outsized and heavy freight as well. Apart from the standard transports, we also operate special chassis at your request. Vertical lifters, vehicles with tilting chassis and sideloaders are available. In addition, Contargo takes care of freight-linked storage, servicing and repair, as well as the sale and rental of containers. You can view and select the containers on location at our terminal. If required, we provide the containers with a sideloader. Our special services include loading and unloading the goods, including installation of inlets and flexitanks, as well as disposal following disassembly.

Accessibility Connectivity

  • Inland shipping connection to/from Rotterdam
    3 connection(s)
  • Transit time by inland shipping
    48 hour(s)
  • Rail connection to/from Rotterdam
    0 connection(s)
  • Transit time by rail
    0 hour(s)
  • Vessel classes permitted at the terminal
    CEMT V
  • Length of longest rail track at terminal
    0 m
  • Supply of cargo to terminal by third parties possible?
    Yes

Security

  • AEO security
    Yes
  • Access control
    Yes
  • Camera surveillance
    Yes

Safety - People

  • Job descriptions include attention for Health & Safety Aspects and control measures
    Yes
  • Health & Safety is evaluated annually with the personnel
    Yes
  • Instructions are given regularly
    Yes
  • (Near) accident registration are registered and subsequent measures are taken
    Yes
  • Personnel comply with the safety regulations and wear protective clothing
    Yes

Safety - Material

  • Fire extinguishers are provided with valid inspection certificate
    Yes
  • Mobile machinery is provided with a maintenance certificate and/or there is a maintenance plan with a logbook
    Yes
  • Terminal is provided with signs which direct pedestrians and vehicles traffic
    Yes
  • Storage tanks and/or generator/power supplies are provided with inspection certificate
    Yes
  • In case of accidents resources are available at reasonable distance
    Yes

Customs

  • AEO Customs
    Yes
  • Local Clearance Procedure
    Yes
  • Customs warehouse
    None

ICT

  • Track & trace cargo data
    Yes
  • EDI communication possible
    Yes
Help us improve