Rail Cargo Terminal-BILK ZRt.

Terminal

Address

Eur├│pa 4
1239
Budapest
Hungary

Services

  • Pre-transport and end-transport
    Yes
  • Warehouse
    Yes, by partner external
  • Transhipment dangerous goods
    Class 1.1, Class 1.2, Class 1.3, Class 1.4, Class 1.5, Class 2.1, Class 2.2, Class 2.3, Class 3.1, Class 3.2, Class 3.3, Class 4.1, Class 4.2, Class 4.3, Class 5.1, Class 5.2, Class 6.1, Class 6.2, Class 8, Class 9
  • Storage dangerous goods
    Class 1.1, Class 1.2, Class 1.3, Class 1.4, Class 1.5, Class 2.1, Class 2.2, Class 2.3, Class 3.1, Class 3.2, Class 3.3, Class 4.1, Class 4.2, Class 4.3, Class 5.1, Class 5.2, Class 6.1, Class 6.2, Class 8, Class 9
  • Reefer connections
    32
  • Empty Depot Services
    Repair, Pre-trip Inspection, Estimating

Opening hours

Business
Monday6:00-22:30
Tuesday6:00-22:30
Wednesday6:00-22:30
Thursday6:00-22:30
Friday6:00-22:30
Saturday6:00-12:00
SundayClosed
Rail
Monday0:00-23:59
Tuesday0:00-23:59
Wednesday0:00-23:59
Thursday0:00-23:59
Friday0:00-23:59
Saturday0:00-23:59
SundayClosed

Empty container depots

OperatorPickUpDropOff
NYK Line

Sustainability

CO2 emission/container: 12.92 kg Terminal avg.: 12.15 kg
CO2 reduction (level 0-4):
  • Monitoring fuel usage
  • Efficient equipment usage
  • Efficient operations
  • Communication
  • Innovation
  • Supply chain collaboration
CO2 reduction level (avg)
0
1
2
3
4

This terminal was last audited on: Wednesday, May 7, 2014

Audit details

(last audit on Wednesday, May 7, 2014) Info on terminal details

Profile

  • Lot size terminal
    223000 m2
  • Capacity - containers per annum
    220000
  • Quay length
    0 m
  • Number of rail tracks on terminal
    7
  • Number of reach stackers
    3
  • Number of empty stackers
    1
  • Rail Cargo Terminal-BILK is the largest terminal in Hungary, with excellent road and rail connections. Only one other terminal is similar. Good location, available capacity, realized innovative technologies on terminal, and role as environmental diversion reducer for capital city provide the important state for terminal. BILK Kombitermin├íl can work as a HUB between West - and East-Europe in combinated transport flows because of the huge relationships. The terminal has the capacity to provide complex services covering the complete inland process of combined transport. Two 42 ton cranes are available With block trains running regularly, it has direct connection with the significant harbors and terminals of Europe.

Accessibility and Connectivity

  • Inland shipping connection to/from Rotterdam
    0 connection(s)
  • Transit time by inland shipping
    0 hour(s)
  • Rail connection to/from Rotterdam
    4 connection(s)
  • Transit time by rail
    36 hour(s)
  • Vessel classes permitted at the terminal
    None
  • Length of longest rail track at terminal
    750 m
  • Supply of cargo to terminal by third parties possible?
    No

Security

  • AEO security
    No
  • Access control
    No
  • Camera surveillance
    Yes

Safety - People

  • Job descriptions include attention for Health & Safety Aspects and control measures
    Yes
  • Health & Safety is evaluated annually with the personnel
    Yes
  • Instructions are given regularly
    Yes
  • (Near) accident registration are registered and subsequent measures are taken
    Yes
  • Personnel comply with the safety regulations and wear protective clothing
    Yes

Safety - Material

  • Fire extinguishers are provided with valid inspection certificate
    Yes
  • Mobile machinery is provided with a maintenance certificate and/or there is a maintenance plan with a logbook
    Yes
  • Terminal is provided with signs which direct pedestrians and vehicles traffic
    Yes
  • Storage tanks and/or generator/power supplies are provided with inspection certificate
    Yes
  • In case of accidents resources are available at reasonable distance
    Yes

Customs

  • Customs warehouse
    Temporary storage external

ICT

  • EDI communication possible
    Yes
Help us improve